Expansion of Data Centre, Rotterdam

Opdrachtgever Kuijpers Architect

Bureau Bouwkunde’s contribution:

  • architectural plan development
  • construction-ready design
  • BIM clash control

Bureau Bouwkunde, in collaboration with Constructif, was responsible for creating the Construction-Ready Design (UO), including details, for the expansion of a data centre in Rotterdam. Our team conducted clash control on the architectural BIM model to ensure its integration and coordination with elements such as the steel and concrete structures. DVTadvies was responsible for the development of the installations.

The final result of this project is a great example of the added value of a BIM model, particularly in terms of collaboration and coordination among various construction partners.

See also